AS/RS

Factory-wide Intelligent Logistics
  • Project Scale:30M
  • Stacker Crane:8 sets
  • Storage Location:25000
  • Conveying Equipment:95 sets
  • Unmanned Forklift:25 sets
  • It involves a process: A support warehouse is used in this production process. Its storage locations are designed to integrate with the production system, allowing for coordinated scheduling based on the specific needs of the process.
Automobile Manufacturing
  • Project Scale:30M
  • Conveying Line Body:3000 meters
  • Jacking and Lifting Load:Over 300 units
  • Jacking Positioning:Over 100 units
  • Project Profiles: The process necessitates fulfilling the transportation and storage requirements of the blade battery, starting from the one-time liquid injection and continuing through to the pack assembly.
Automotive Manufacturing
  • Project Scale: 2.3M
  • Stacker: 1 set
  • Storage Location: 246
  • Lift-and-Transfer Mechanism: 2 sets
  • Project Profiles: It requires the implementation of unmanned storage and retrieval of end-effector carts.
Vehicle Frame
  • Project Scale: 10M
  • Project Profiles: This project, a buffer warehouse for stamped vehicle frame parts, is located in Singapore. It utilizes a double-mast, double-deep stacker crane system, along with beam-type racking and Sichuan-style steel pallets.
  • Technical Scope: Storage location | 3360, double-deep stacker | 3 sets, inbound and outbound capacity | 80 pallets per hour, storage cell 1200 kg rack height | 12.8 meters
  • Project Timeline: Delivery and commissioning within 4 months.
3C
  • Project Scale: 120M
  • Project Profiles: 4 DT fully automated assembly lines and 8 automatic feeding lines.
  • Technical Scope: Automatic assembly, automatic testing, automatic packaging, finished goods logistics, control software, etc.
  • Project Timeline: Power on trial production within 5 months of delivery.
  • Reduce Manpower & Increase Efficiency: Each production line is configured with 23 automated workstations, along with an integrated AS/RS equipped with an aging function. The entire project comprises a total of 92 automated workstations.